Chaix Company Logo
Return Home
Company History & Profiles
Contact Form
You Are Here
Manufacturing Partnerships
What's New!
 
 
C O M P L E T E DXP R O J E C T S
Click on any picture for an enlarged view and description of photo.

BACK TO PROJECT CATAGORIES


Exactly! Vertical
San Francisco, California

Advanced Equipment

Two Advanced Equipment Gamma Series operable walls, with full height writing surface, enhance a creative and flexible space at this internet company.

Architect: Studios
General Contractor: Dome Construction
Installed: 2000


marriott1
marriott3

BACK TO TOP OF PAGE

marriott2

City Center Marriott
Oakland, California

Advanced Equipment

These Advanced Equipment alpha series operable wall panels were installed into an existing facility, replacing a competitor's worn-out panels. 105 old panels were removed and replaced with new ones as part of a ten day project. These 13 foot tall panels included 12 pass-through doors. This compressed duration project minimized the down time for the hotel.

Owner: Park Lane Hotels International
Installed: 1999


deloitte1

BACK TO TOP OF PAGE

deloitte2

Deloitte and Touche
San Francisco, California

Advanced Equipment

Advanced Equipment Alpha series operable wall system separates corporate boardroom from lobby area.. Maple veneer facing with double pane glass panels and custom powder coated trim.

Architect: Bottom Duvivier, SF
General Contractor: R. N. Field Construction Inc.
Installed: 1999


BACK TO TOP OF PAGE

Hugo Boss
Beverly Hills, California

Huppe non-acoustical tinted glass operable panels with powder coated trim. This German manufactured product is extremely attractive. These partitions are generally quite expensive and have a long lead time. Appropriate for high end retail and corporate environments.

Architect: Brand & Allen, SF
General Contractor: Fisher Development
Installed: 1997


San Ramon 2
San Ramon 3

BACK TO TOP OF PAGE

San Ramon 1

Marriott Hotel
San Ramon, California

Advanced Equipment

The San Ramon Marriott is one of our largest projects completed to date. Advanced Equipment Alpha Series panels and #1A were installed into an existing ballroom (96 panels at 14' tall). Nine working days over the Thanksgiving holiday were allowed for complete removal of the existing competitor's product, and installation of the new system. Numerous challenges were creatively overcome to complete the work ahead of schedule, and without any additional cost to the owner.

Architect: None-Direct Sale to San Ramon Marriott
General Contractor: None-Direct Sale to San Ramon Marriott
Installed: December 2000




BACK TO TOP OF PAGE

Coblentz, Patch Duffy & Bass, LLP

Advanced Equipment

Project: Coblentz, Patch, Duffy & Bass, LLP
Location: San Francisco, CA
Architect: Aston Pereira & Associates
Contractor: WEBCOR Construction, Inc.
Installed: October 2003
Photographer: Tim Griffith, tim@timgriffith.com


BACK TO TOP OF PAGE

Electronic Arts Sports

Advanced Equipment

23-foot tall, perforated steel Alpha Series panels provide unsurpassed sound separation and absorption.

Note dual wall configuration for the ultimate in sound separation. Also, note that side walls "step up" the different seating levels!

Project Name: Electronic Arts
Architect: Skidmore, Owens & Merrill LLP
General Contractor: Webcor Builders
Installed: August 2002




BACK TO TOP OF PAGE

Moscone Convention Center

Advanced Equipment

This massive project consisted of one mile of operable walls! Advanced Equipment was specified for the project based on a proven track record of completing large-scale convention center projects in the past. The Alpha Series panels and #88 Track System will provide years of rugged service.

Special equipment was used to stand
1,100 panels that were each 28 feet tall.

Job:
Moscone Convention Center
Location: San Francisco, CA
General Contractor: Hunt Construction
Architect: Gensler Architecture Design
Installed: October 2002


BACK TO TOP OF PAGE

SLAC Reseach Center

Advanced Equipment

Advanced Equipment Corporation Alpha Series panels with fabric finish and integral LCS white boards.

This large conference space can be divided in several configurations, hosting scientists from all over the world!

Project Name: S.L.A.C. Research Office Building
Architect: Kornberg Associates
General Contractor: W.L.. Butler Construction, Inc.
Installed: February 2002



BACK TO TOP OF PAGE

University of California, Monterey Bay Campus

Advanced Equipment

Four equal panels, 12 feet tall, with a custom wood veneer finish.

Same operable partition, shown in the "open" position.

Project Name: UC Mbest Center
Architect: David Baker Associates
General Contractor: Tombleson, Inc.
Installed: May 2001




BACK TO TOP OF PAGE

UCSF Mission Bay

Advanced Equipment

Project: UCSF Mission Bay, Bldg. 19B
Location: San Francisco, CA
Architect: FLAD Associates
Contractor: Gilbane Building Company
Installed: July 2003




BACK TO TOP OF PAGE

Washington Hospital

Advanced Equipment

Advanced Equipment Alpha Series operable walls create flexible dividers for these large training rooms.

Special ceiling track allows for panels to be stacked along perimeter walls when not in use!
Job:
Washington Hospital

Location: Fremont, CA
General Contractor: Dome Construction
Architect: AKOL Architects, Oakland
Installed: November 2001


CATAGORIES: Lockers | Projection Screens | Toilet Partitions | Project List
CONTACT US | COMPANY HISTORY | MANUFACTURING PARTNERSHIPS | RETURN HOME

All images & information © Chaix Company 2004